Implementation of RNP Approaches with Vertical Guidance at Brussels Airport (EBBR)

Description

The project concerns the implementation of Required Navigation Performance (RNP) Approaches (Lateral Navigation/Vertical Navigation (LNAV/VNAV) and Localiser Performance with Vertical guidance (LPV) minima) on the instrument runway ends of Brussels Airport (6) which are located within the Brussels TMA.

This project is limited to the development of the procedures, not involving the implementation of any technical infrastructure to support it, e.g. monitoring of GNSS or implementation of GBAS.

Objectives

Implement Required Navigation Performance (RNP) Approaches (Lateral Navigation/Vertical Navigation (LNAV/VNAV) and Localiser Performance with Vertical guidance (LPV) minima) on the instrument runway ends of Brussels Airport (6) which are located within the Brussels TMA.

Achieve compliancy with ICAO Resolution AR37.11, EC Part-AUR, Subpart PBN and Commission Implementing Regulation (EU) No 716/2014 Annex 1.

Expected Performance Benefits

Safety Positive impact 1. Reducing Controlled Flight Into Terrain (CFIT) rate
Capacity Positive impact 2. Improved airport accessibility and cost effectiveness, maintaining runway throughput
Flight efficiency Positive impact 3. Reducing fuel cost and flight time
4. Reducing the missed approach rate due to procedures allowing lower minima

Flexibility
Quality

Positive impact 5. Better backup for Instrument Landing System (ILS) approach will be provided by using LPV approach
Interoperability Positive impact 6. Satellite Based Augmentation Systems (SBAS) allow a seamless global world-wide navigation service

 

Example

See press release issued on 2 March 2017 and news about INEA visit:

Satellite navigation landings increase safety, accessibility and capacity at Brussels Airport

INEA delegates visit Belgocontrol and Brussels South Charleroi Airport to discuss the progress of the RNP project

INEA visite Belgocontrol et Brussels South Charleroi Airport pour évaluer le progrès dans le projet RNP

INEA bezoekt Belgocontrol en Brussels South Charleroi Airport om de geboekte vooruitgang van het RNP-project te bespreken

 

Rapport annuel 2016   (3.39 Mb)
Vidéo: L’avenir - Une stratégie en 3 axes  
FAB Europe Central   (0.72 Mb)
FABEC: Facts and Figures   (0.57 Mb)
FABEC newsletter - February 2014